For Booking: +971 4 397 3347
For Inquiries: +971 55 993 4823
Office Timing: 8am - 8pm

PRODUCT DATA SHEET

Product Name: 3D Matrix Coating
Product Number: AT-V1-50B / AT-V1-50T
Country of Origin: Germany
Storage Life: 12 Months
Uses: Painted Surfaces
Packaging: 50ml
fa2551_927ed67acda14801888685db205de961_mv2_d_3000_3000_s_4_2

INSTRUCTIONS FOR USE

APPLICATION OF V1 (Base)

  • Shake well before use.
  • Get ready with 3 pieces of brand new, lint-free microfiber towel. (It is recommended that new towels to be rinsed or washed with water prior to use to reduce the loosing lint)
  • When first applying V1 (Base) on substrate, it is recommended to condition the surface of the applicator block with 7-8 drops to prevent skipping or dry spots.
  • Do not work on large area at a time. It is recommended to do a 1 ft. x 4 ft. area or 2 ft. x 4 ft. at a time.
  • Apply V1 (Base) using normal pressure on applicator. Make sure the area is well covered. Always start from an edge to avoid excess on other panels. Work in controlled areas to remember where you previously applied. Work in horizontal or vertical movements to ensure that product is carried through consistently.
  • Use first towel to immediately level the product.
  • Go immediately over with second microfiber towel with polishing motion until the surface is free from residue.
  • Follow by the third towel (this is called the “insurance towel”) and go over the surface one extra time just to make sure you haven’t miss any streaks or excess residue.
  • When the whole car is applied, allow curing of coating to begin. Wait approximately 30-60 minutes before applying a second layer. Curing times depend on temperature and humidity. Applying too early and the product will dissolve the previous layer.

APPLICATION OF V1 (Top)

  • Shake well before use.

  • Get ready with 3 pieces of brand new, lint-free microfiber towel.

  • When first applying V1 (Top) on substrate, it is recommended to condition the surface of the applicator block with 7-8 drops to prevent skipping or dry spots.

  • Do not work on large area at a time. It is recommended to do a 1.5 ft. x 1.5 ft. at a time.

  • Apply V1 (Top) using normal pressure on applicator. Make sure the area is well covered. Always start from an edge to avoid excess on other panels. Work in controlled areas to remember where you previously applied. Work in horizontal or vertical movements to ensure that product is carried through consistently.

  • Use first towel to immediately level the product.

  • Go immediately over with second microfiber towel with polishing motion until the surface is free from residue.

  • Follow by the third towel (the “insurance towel”) and go over the surface one extra time just to make sure you haven’t miss any streaks or excess residue.

  • When the whole car is applied, allow curing of coating to begin. Wait approximately 60 minutes before delivery of car to customers. Curing times depend on temperature and humidity.

INFRA-RED CURING

Curing can be accelerated by using IR Lamps after V1 Top is applied.Recommended settings for IR lamps are as following:
i. Minimum 80cm of distance above the surface.
ii. Maximum 70⁰C of surface temperature.
iii. Maximum 30 minutes on each panel.

EFFECTS & PERFORMANCE

Call Now